Engineering Board Exam Reviewer · ECE · medium

A performance guarantee test in an electronic systems contract is conducted to:

  1. Verify that the installed system meets the specified performance requirements before acceptance
  2. Select the winning bidder
  3. Train the owner's staff only
  4. Determine the contractor's profit

Answer

A. Verify that the installed system meets the specified performance requirements before acceptance

Solution

Also called acceptance testing or commissioning.

More ECE questions

  1. An extension of contract time is usually justified when delay is caused by:
  2. 'Time is of the essence' in a contract means that:
  3. A subcontractor is a party who:
  4. Substantial completion of a project means that:
  5. A 'punch list' prepared near the end of a project contains:
  6. A 'Request for Information' (RFI) in a project is used by the contractor to:
  7. When there is a conflict between the drawings and the specifications and the contract is silent on precedence, the generally accepted rule…
  8. In which type of contract does the CONTRACTOR bear the greatest risk of cost overruns?
  9. In which type of contract does the OWNER bear the greatest risk of cost overruns?
  10. The period after completion during which the contractor must repair defects at its own cost is the:

All ECE questions