Engineering Board Exam Reviewer · Environmental Engineering · easy
The Philippine Environmental Impact Statement (EIS) System was established by:
- RA 9003
- PD 1067
- PD 1586
- RA 7160
Answer
C. PD 1586
Solution
Projects in environmentally critical areas or that are environmentally critical require an Environmental Compliance Certificate (ECC).
More Environmental Engineering questions
- The Toxic Substances and Hazardous and Nuclear Wastes Control Act of 1990 is:
- The Philippine Clean Water Act of 2004 is:
- The Philippine Ecological Solid Waste Management Act of 2000 is:
- The international treaty controlling transboundary movements of hazardous wastes is the:
- Waste that is ignitable, corrosive, reactive or toxic is classified as:
- A Materials Recovery Facility (MRF) is used for:
- The biological decomposition of organic waste under controlled aerobic conditions to produce a soil conditioner is called:
- The liquid that drains through solid waste in a landfill and carries dissolved contaminants is called:
- An engineered site for the disposal of solid waste with liners, leachate collection and daily cover is called a:
- The 3Rs of waste management are: