A plant with 750,000 employee-hours lost 240 days due to injuries. What is the severity rate (days lost per 1,000,000 employee-hours)?
- 64
- 40
- 320
- 240
Answer
C. 320
Solution
SR = days lost × 1,000,000/employee-hours = 240 × 106/750,000 = 320.
More Environmental Engineering questions
- A plant with 750,000 employee-hours worked had 6 disabling injuries in a year. What is the frequency rate (per 1,000,000 employee-hours)?
- A city collects 60 tonnes of waste per day. Each truck carries 8 tonnes per trip and makes 3 trips per day. How many trucks are needed?
- A 100 kg sample of wet food waste weighs 30 kg after drying. What is its moisture content (wet basis)?
- Loose waste with a density of 300 kg/m3 is compacted to 600 kg/m3. What is the percent volume reduction?
- Of 60 tonnes/day of collected waste, 12 tonnes are recycled and 18 tonnes are composted. What is the waste diversion rate?
- A landfill must hold 36,500 m3 of compacted waste per year, plus 25% extra volume for daily cover. If it is filled to an average depth of…
- A city produces 60 tonnes of solid waste per day. If the waste is compacted to a density of 600 kg/m3 in a landfill, what volume is needed…
- A city of 100,000 people generates 0.6 kg of solid waste per capita per day. What is the daily waste generation?
- A sound intensity that is 1000 times the reference intensity corresponds to a sound intensity level of:
- With a machine running, the noise level is 95 dB. With the machine off, the background level is 88 dB. What noise level is due to the…