Engineering Board Exam Reviewer · Fluid Mechanics · medium

A fluid that requires a yield stress before it begins to flow (e.g., toothpaste) is called a:

  1. Newtonian fluid
  2. Pseudoplastic fluid
  3. Ideal fluid
  4. Bingham plastic

Answer

D. Bingham plastic

Solution

After yield, a Bingham plastic flows with a linear stress–strain-rate relation.

More Fluid Mechanics questions

  1. A fluid whose viscosity decreases with increasing shear rate (e.g., paint, blood) is called:
  2. Viscosity is the property of a fluid that offers resistance to:
  3. When a liquid surface is curved convex upward in a capillary tube (e.g., mercury in glass), the contact angle is:
  4. A surge tank in a hydroelectric plant is used to:
  5. The specific speed of a turbine is used to:
  6. In a reaction turbine, the draft tube is used to:
  7. The quantity V2/2 is called the:
  8. Gauge pressure readings below atmospheric pressure are referred to as:
  9. A Bourdon tube gauge measures:
  10. Critical flow in an open channel corresponds to:

All Fluid Mechanics Reviewer questions