Factory Output per Shift

Study the bar graph below. It shows the number of units a factory produced in each of its three shifts in one day. Use it to answer the questions that follow.

Which shift produced the FEWEST units?

  1. Shift A
  2. Shift C
  3. All produced the same
  4. Shift B

Answer

D. Shift B

Solution

Shift B produced 385 units, the lowest.

More Data Interpretation questions

  1. Water costs ₱28 per cubic meter. What is the total cost for the weeks in which consumption was ABOVE 95 m³?
  2. What was the percent increase in consumption from Week 1 to Week 6?
  3. What was the average weekly consumption?
  4. What was the total water consumption for the six weeks?
  5. In which week was water consumption the HIGHEST?
  6. What is the ratio of Technology books to Reference books in lowest terms?
  7. If the library adds 90 Science books, Science books will make up what percent of the new total?
  8. What percent of the books are fiction?
  9. How many books does the library have in all?
  10. Which category has the MOST books?

All Data Interpretation questions